Herning Svømmehal

Herning Svømmehal

en/

A wavy swim stroke

Bay Arch’s design for the new addition to Herning Svømmehal has been awarded 1st prize in a competition. When the building is completed Herning Svømmehal will be the largest swim centre in Denmark.

The existing building shows a significant and wavy building profile, which the new building clearly relates to. The new addition shows a simple and elegant building, and the main design element is a light wavy roof, which creates many different and intimate spaces both inside and outside.

The wavy roof continues the idiom of the existing architecture and also reflects the inside use of the building, by showing a clear reference to the swimming world – from the light waves to the dynamic swim strokes.

 

da/

Et bølgende svømmetag

Bay Arch har designet en ny tilbygning til Herning Svømmehal med plads til flere bassiner, klubfaciliteter og et udendørs bassin. Med denne tilføjelse er Herning Svømmehal nu Danmarks største.

Den eksisterende bygning fra slut 1960’erne har en meget markant profil med elegante, bølgede tage som har været en inspirationskilde for designet af tilbygningen. Arkitekturen er enkel, men elegant og med et markeret, flydende tag, der skaber flere hyggelige og intime rum både inde og ude til mange forskellige aktiviteter.

Det bølgende tag fortsætter formsproget fra den eksisterende bygning og afspejler bygningens funktion ved at have klare referencer til svømmeverdenen fra lette bølger til dynamiske svømmetag.

 

  

NAME : Herning Swim Centre 

LOCATION : Herning, DK   

TYPE : Swim Centre 

SIZE : 4.500 m2 

STATUS : Completed – Competition win 2015   

CLIENT : Herning Kommune   

ROLE : Architect   

TEAM : Christian Bay-Jørgensen – Morten Østergaard – Karsten Schmidt   

COLLABORATORS : C.C. Contractor A/S – MOE A/S